Trail MountainElectric

Industrial & Mission-Critical

Industrial & Mission-Critical Electrical

Data centers, manufacturing, healthcare, and utility-grade infrastructure.

Get started

Free preliminary estimate. Two business day turnaround.

Certified, qualified, and trusted by

47+ licensed electricians · 2,400+ projects delivered

Generac Premier DealerTesla Certified PowerwallNABCEP Certified PVChargePoint AuthorizedNECA Member ContractorOSHA 30 WorkforceNFPA 70E QualifiedNETA Acceptance TestingUtah Licensed PEMSHA Surface CertifiedGenerac Premier DealerTesla Certified PowerwallNABCEP Certified PVChargePoint AuthorizedNECA Member ContractorOSHA 30 WorkforceNFPA 70E QualifiedNETA Acceptance TestingUtah Licensed PEMSHA Surface Certified

Overview

Mission-critical industrial electrical for data centers, healthcare, manufacturing, water/wastewater, and utility-scale infrastructure. Medium-voltage to 35kV, NETA acceptance testing, and a 24/7 service bench.

Industrial owners trust Trail Mountain Electric because we build to the tolerance their process demands. Our industrial division has installed over 380MW of distribution since 2015, including data center build-outs in Bluffdale and Eagle Mountain, biopharma cleanrooms in Salt Lake, and utility-scale solar coupled to BESS in Tooele County.

We carry NFPA 70E-qualified crews, full PPE Cat 4 inventory, and an in-house NETA-trained acceptance and maintenance group. We design coordination studies, arc-flash labeling, and selectivity reports under licensed PE oversight, and we maintain a fleet of medium-voltage cable trailers, hydraulic press tools, and a Megger MIT525 high-voltage test set so our crews never wait on rented gear when a one-day shutdown matters.

Mission-critical clients also get our 24/7 dispatch line. Average response time to a critical industrial call inside our Wasatch Front service zone is under 60 minutes, with parts trucks staged in Heber, SLC, and Provo.

Capabilities

What we self-perform under this discipline.

Our crews self-perform every capability listed below. We sub specialty trades only when the scope demands it, and we manage them under our prime contract.

  • Medium-voltage installation up to 35kV
  • Substation and switchgear assembly
  • Data center power chain (utility → UPS → PDU → branch)
  • Healthcare essential electrical systems (NFPA 99 Type 1)
  • Manufacturing process power and controls
  • Variable frequency drive (VFD) install and commissioning
  • Coordination, arc-flash, and short-circuit studies
  • NETA acceptance testing and preventive maintenance
  • PLC and SCADA wiring (Allen-Bradley, Siemens, Modicon)
  • Cable tray, ladder rack, and bus duct systems

Frequently asked

Common questions about this service.

  • Yes. Our MV crew holds NFPA 70E qualification at the 480V–35kV range, and our lead testers carry NETA Level 3 or higher with full PPE Cat 4 inventory and Megger high-voltage test equipment in-house.

What clients say

Owners and general contractors keep coming back.

Roughly 70% of our annual commercial volume is repeat business with the same owners and GCs. Below are recent quotes, all attributed and verifiable.

"Trail Mountain ran our data center expansion like a Tier III is supposed to run — clean drawings, paralleled the gear without a single false transfer, and finished seven weeks ahead of schedule. They were the only contractor on site whose punch list we accepted on first walk."
Sarah Coltrin, PE
Director of Critical Facilities · Wasatch Data Vault
Data Center
"We've used Trail Mountain on three hospital pavilions now. They self-perform the work, they understand NFPA 99, and they bring documentation that makes our QA team's job easier — not harder. They're our go-to electrical contractor for healthcare in Utah."
Daniel Reyes
Director of Construction · Big-D Construction
Healthcare GC
"Our 20,400 sq ft Promontory home had a Lutron HomeWorks panel with 340 channels, hybrid Powerwall and Kohler standby, snowmelt, architectural lighting — Trail Mountain commissioned the whole house in a single pass with zero punch items. That doesn't happen."
Michael & Liana Bowen
Homeowners · Promontory Club
Custom Residential
"We selected Trail Mountain for the I-15 NEVI corridor because they could actually deliver eleven sites in nine months. Every site passed FHWA reimbursement on the first audit, and uptime has held above 99% since commissioning."
Jordan Whittaker
EV Infrastructure Program Manager · Utah Department of Transportation
Government
"Our cleanroom expansion happened inside a fully operational biotech facility. Trail Mountain coordinated through QA, met our IQ/OQ timeline with zero rework, and our validation team accepted their documentation on first review — which never happens with electrical."
Dr. Aisha Patel
VP, Manufacturing Operations · Confidential Biotech Manufacturer
Biotech
"I've worked with maybe a dozen solar contractors across Utah. Trail Mountain is the only one I'd hand a 12MW ground-mount and an 8MWh BESS to without sleepless nights. They commissioned three months early. We saved $1.8M in MACRS and ITC."
Brent Eubanks
Energy Manager · Tooele County Energy Cooperative
Utility-Scale Solar

Ready when you are

Tell us about your project. We'll come back inside two business days with a real estimate.

Free residential and commercial preliminary estimates. PE-stamped engineering for design-build. Same-day service across the Wasatch Front and Back. No high-pressure sales — just licensed master electricians and a transparent quote.