Featured projects

Eighteen years of mission-critical builds across the Mountain West.

Below are recent representative projects across data centers, healthcare, government, solar, multifamily, and luxury residential. Each entry includes the owner, GC, and project value where the client has approved disclosure.

Data Center$28.4M2025

Wasatch Data Vault — Tier III Colocation, Phase 2

Client
Wasatch Data Vault
General contractor
Layton Construction
Location
Bluffdale, UT

Phase 2 expansion of a Tier III colocation campus in Bluffdale, adding 1,200 racks of capacity behind 2N redundant UPS, paralleling generators, and a fully commissioned BMS-integrated electrical chain.

Scope

  • Utility-side 13.8kV switchgear and 5MVA transformer
  • 2N redundant UPS distribution to 1,200 racks
  • Hot-aisle containment electrification and BMS integration
  • Onsite 4MW generator paralleling switchgear
  • Arc-flash study, NETA acceptance, and commissioning

Highlights

  • Phase 2 delivered seven weeks ahead of schedule
  • Zero unplanned outages during cutover
  • BICSI-aligned cabling for 100Gb spine and 25Gb leaf fabric
Healthcare$11.2M2024

Deer Valley Medical Pavilion

Client
Intermountain Health
General contractor
Big-D Construction
Architect
MHTN Architects
Location
Park City, UT

Outpatient surgery and oncology pavilion serving Park City and the Wasatch Back. Includes full NFPA 99 Type 1 essential electrical system, isolated power for ORs, and code-blue infrastructure across three floors.

Scope

  • NFPA 99 Type 1 essential electrical system
  • Dual 1,500kW standby with paralleling switchgear
  • Operating room isolated power panels (IPPs)
  • Nurse call, code blue, and patient monitoring rough-in
  • DAS and 5G in-building coverage support

Highlights

  • Surgical suite delivered ahead of schedule for early commissioning
  • All life-safety branches load-bank tested and certified
  • Full BIM-coordinated install with mechanical and structural
Government$14.8M2025

I-15 NEVI Corridor — DCFC Buildout

Client
Utah Department of Transportation
Location
St. George to Tremonton, UT (11 sites)

Federal NEVI-funded buildout of eleven 350kW DCFC stations along I-15, from St. George through the Wasatch Front to Tremonton. Includes utility coordination, battery-buffered chargers at constrained sites, and uptime-managed service.

Scope

  • Site-by-site utility coordination and service upgrades
  • 350kW DC fast charging deployment (4 ports per site)
  • Battery-buffered DCFC at three constrained sites
  • OCPP-aligned network integration
  • 97% uptime SLA with 24/7 dispatch

Highlights

  • Eleven NEVI-compliant sites delivered in 9 months
  • All sites passed FHWA reimbursement audit on first review
  • 99.4% measured uptime since commissioning
Solar$17.6M2024

Tooele Solar + 8MWh BESS

Client
Tooele County Energy Cooperative
Location
Tooele County, UT

Utility-scale solar paired with 8MWh battery storage for a Tooele County cooperative. Delivers daytime PV generation and dispatchable evening capacity, displacing wholesale demand-charge exposure during peak periods.

Scope

  • 12MW DC ground-mount PV array
  • 8MWh lithium-iron-phosphate BESS
  • 34.5kV interconnection to PacifiCorp distribution
  • SCADA, AGC, and monitoring
  • Commissioning, IV trace, and capacity testing

Highlights

  • Commissioned Q3 2024, three months ahead of schedule
  • $1.8M in MACRS and ITC capture for the cooperative
  • Active demand-charge mitigation reducing wholesale exposure
Multifamily$1.4M2025

Promontory Estate Custom Home

Client
Private — Promontory Club
Architect
Otto-Walker Architects
Location
Park City, UT

20,400 sq ft custom home in Promontory with full Lutron HomeWorks integration, hybrid Powerwall-and-generator backup, snowmelt control, and architectural lighting commissioned in a single pass with zero punch items.

Scope

  • 400A residential service with redundant feeders
  • Lutron HomeWorks lighting control (340 channels)
  • Tesla Powerwall × 4 with whole-home backup
  • Kohler 48kW liquid-cooled standby generator
  • Architectural and landscape lighting
  • Heated driveway and snowmelt control

Highlights

  • Single-pass commissioning with zero punch items
  • Powerwall + Generator hybrid backup with seamless transfer
  • BIM-coordinated install with mechanical and AV trades
Industrial$8.9M2024

Salt Lake Biotech ISO-7 Cleanroom

Client
Confidential Biotech Manufacturer
General contractor
Okland Construction
Location
Salt Lake City, UT

ISO-7 cleanroom expansion for a Salt Lake biotech manufacturer. Required validation-grade documentation, PLC integration, and coordination through an occupied production facility.

Scope

  • ISO-7 cleanroom power distribution
  • Process equipment 480V 3-phase install
  • VFD-driven HVAC integration
  • PLC and SCADA wiring (Allen-Bradley)
  • Validation-grade documentation and FAT/SAT

Highlights

  • Met IQ/OQ validation timeline with zero rework
  • Coordinated install through occupied facility
  • Documentation accepted by client QA on first review
Commercial$6.8M2024

Ogden Skyline Multifamily Tower

Client
Skyline Development Partners
General contractor
Jacobsen Construction
Architect
GSBS Architects
Location
Ogden, UT

320-unit Class A multifamily tower in downtown Ogden with 192-port Level 2 EV charging in the parking structure, centralized fire alarm, and solar-ready conduit pathways for future PV.

Scope

  • 320-unit electrical rough-in and trim
  • Common-area lighting and controls
  • 192-port Level 2 EV charging in parking structure
  • Centralized fire alarm with ECRI integration
  • Solar-ready conduit and roof penetrations

Highlights

  • Delivered floor-by-floor on a 14-day cycle
  • EV charging powered by 600kW dedicated service
  • Pre-leased 95% within 60 days of TCO
Education$3.4M2023

Logan School District LED & Controls Retrofit

Client
Logan City School District
Location
Logan, UT

District-wide LED and controls retrofit across twelve schools, capturing $420K in Rocky Mountain Power rebates and a measured 32% reduction in lighting kWh.

Scope

  • 12-school LED retrofit (4,200+ fixtures)
  • nLight networked controls integration
  • Daylight harvesting and occupancy sensing
  • Rocky Mountain Power rebate management
  • Verified energy savings reporting

Highlights

  • $420,000 captured in utility rebates
  • 32% measured kWh reduction year-over-year
  • Completed each school within summer recess window

Want to discuss a similar build?

Our project executives can provide qualifications, references, and past-performance documentation under NDA where required.

Start a conversation

Ready when you are

Tell us about your project. We'll come back inside two business days with a real estimate.

Free residential and commercial preliminary estimates. PE-stamped engineering for design-build. Same-day service across the Wasatch Front and Back. No high-pressure sales — just licensed master electricians and a transparent quote.