Wasatch Data Vault — Tier III Colocation, Phase 2
- Client
- Wasatch Data Vault
- General contractor
- Layton Construction
- Location
- Bluffdale, UT
Phase 2 expansion of a Tier III colocation campus in Bluffdale, adding 1,200 racks of capacity behind 2N redundant UPS, paralleling generators, and a fully commissioned BMS-integrated electrical chain.
Scope
- Utility-side 13.8kV switchgear and 5MVA transformer
- 2N redundant UPS distribution to 1,200 racks
- Hot-aisle containment electrification and BMS integration
- Onsite 4MW generator paralleling switchgear
- Arc-flash study, NETA acceptance, and commissioning
Highlights
- Phase 2 delivered seven weeks ahead of schedule
- Zero unplanned outages during cutover
- BICSI-aligned cabling for 100Gb spine and 25Gb leaf fabric